We specialize in efficiency and planning to meet extreme schedules on specialty projects. An example would be the Amazon Distribution Center in Phoenix, Arizona.

Another example of what we bring to the table is the Logistic Project in Somerville, New Jersey, that we completed in 2018. By developing a hoisting system, we were able to erect a 500,000-square-foot warehouse building by performing 90% of the work on the ground.

Summerville

In San Diego, we completed a temporary air traffic control tower. Kevin designed a specialty rigging system for a $1-million temporary FAA traffic control system. It was a unique one-time-only setup, which included a converted RV fitted with fiber optics equipment intact.